in a plastic molded package, the difference in the bottom cavity position from a leadframe datum when compared to design. This measurement ignores leadframe tolerances. [SEMI G54-93] Also called cavity-to-frame offset. Also see mismatch and overlap.
Search the Dictionary
© chemicool.com
Tools |
Periodic Table |
Citing Chemicool |
About |
Privacy |
Contact |
Archive
1 |
Science network |
Forum |
